This weeks update from the port on Fisherman's Terminal.


The Contractor has turned over new Dock 6 to the Port of Seattle.  They continue working on small miscellaneous items.  The new knuckle-boom crane will be installed as soon as the weather allows for grout placement.
Pile driving continues for new Dock 5 fixed pier using the vibratory hammer.  Selected "proof piles" will be driven for the last 5-feet with the impact hammer.  Data obtained from the "proof piles" will determine the bearing capacity of the piles.

The welding crew is following behind the pile driving operation, welding structural rebar into the steel piles.  When a sufficient number of piles are welded, the crew will start installing falsework/formwork for the new concrete pile caps.
Select demolition continues on old Dock 6.

The dive crew is scheduled to arrive on-site to perform a pre-demolition survey of the existing debris.

Contact Personnel:
Resident Engineer   Chris Sherwood 728-3310  
Sr. Inspector       Ken Sanberg    571-0127
Project Manager     Tim Leonard    728-3018

 

Share this post : del.icio.us it! digg it! live it! magnolia! reddit! technorati! yahoo!

Comments

No Comments

This Blog

Syndication

Recent Posts

Tags

News

Add to Technorati Favorites <!--SBM--> <SCRIPT LANGUAGE="JavaScript"> function mOvr(src){src.className="sbmDark"} function mOut(src){src.className="sbmDim"} </SCRIPT> <!--SBM-->

Clubs I've Joined

Useful Web Sites

People Out There Cruising

Blogs I Read

Magazines I read

Archives

CommunityServer 2007.1 (Build: 20917.1142)
Aero 2007 SP2.2 (Build: 2007.6.28.32271)
Dream Armada, LLC, Copyright 2005